Assignment Receive Module

A detailed guide on receiving finished goods from workers, tracking wastage, and updating piece-rate ledgers.

Published:

Assignment Receive Module (Improved)

The Improved Assignment Receive module is the final operational step in a manufacturing job. When a worker finishes a job (e.g., Stitching, Cutting) that was issued to them via the Assignment Module, you use this screen to log the return of the goods.

[!IMPORTANT] Architectural Flow: Receiving an assignment automatically updates two critical systems:

  1. It increases your Finished Goods Inventory (Stock Available).
  2. It credits the Worker’s Financial Ledger based on the piece-rate and quantity received.

1. The Receive Dashboard

Navigate to Improved Assignment Receive from the main sidebar.

Dashboard Filters

  • Start/End Date: Filter the history of received jobs.
  • Print Setup: A dropdown to quickly select your preferred thermal printer or A4 printer configuration before batch printing receipts.

The Data Grid

  • Columns: Id, Assignment Id (The source job card), Job Type, Worker, Product, Lot No, Total Qty, Total Box, Adjustment, Amount (The calculated labor payout), and UserName.
  • Verification Status: The Id column displays a green checkmark or red cross indicating if the receipt has been officially verified by a manager.

2. Creating a New Receive Entry

Click the + Assignment Receive button.

2.1 Selecting the Pending Job

You don’t type out the product details manually; you fetch the open job:

  • Worker: Select the contractor returning the goods.
  • Lot No / Job Type: Select the specific Lot and Job Type they were assigned.
  • The system will automatically load the original assignment details, showing exactly what they were supposed to produce based on the sizes defined in the Lot.

2.2 Logging the Output

A grid will appear showing the sizes (e.g., S, M, L) that were issued.

  • Received Quantity: Enter the actual physical count of perfectly finished pieces returned by the worker for each size.
  • Total Box: If the goods are returned packed, specify the number of boxes.

2.3 Financial Adjustments & Wastage

Manufacturing isn’t perfect. This section handles discrepancies:

  • Shortage/Wastage: If the worker damaged materials, log it here.
  • Adjustment Amount: If you need to penalize the worker for the damaged goods, enter a negative financial adjustment. Conversely, you can add bonuses here.
  • The total payable amount (Amount) is automatically calculated as: (Received Qty × Job Rate) + Adjustments.

Click Save to finalize the receipt.

3. Post-Save Actions

  • Print Receipt: Use the print icon in the data grid to hand a physical receipt to the worker confirming their piece-rate payout.
  • Verify: Navigate to the Account Ledger to confirm the labor charges successfully hit the worker’s account.